Before Starting any work, generally, the process of
cleaning occupies, the priority. Similarly, before starting construction, the construction site should be thoroughly cleaned and prepared for construction.
This is called purging of the site from evil effects.
This process requires a well experienced mason, who is
as important as engineer. An in experienced mason with his inefficiency may mar
the fortunes of the residents of the proposed house. Many masons have correct
understanding of Vaastu, brought by generations. The masons should possess
accurate tools to mark the directions and to measure the site. Their important
tools, setsquare to fix, correct corners, intermediate directions, and plumb
line to ensure perpendicular accuracy of the walls, should be used with
diligence. The same tools should be used until the construction is completed,
otherwise, there may be differences in areas of the rooms and place in between
parallel walls.
Marking directions : First the mason should identify all the eight
directions correctly, which is followed by cleaning, and preparation of plot.
The directions, south, west, and southwest must be elevated than east, north,
and northeast. Any pits, shallow places, wells in weak or unfavourable
positions should be filled up. The surface of the site should be levelled with
raise in the directions of south, west and southwest. Avoid sites with
anthills.
Levelling and reforming, raising in the site must be
done before starting construction, but not after, to avoid evil effects of
Vaastu. A well or bore well must be sunk in north east, east or north after the
foundation is laid and only its water must be used for construction. At least,
a sump must be laid in any of these directions. Do not store, the construction
materials like bricks, tiles, wood, steel, stones, lime in north, east or
northeast use south, west or southwest for storing them.
Startingof work : Work should ensure that the excavation starts from
northeast and proceeds towards north west. Repeat the same process from
northeast to southeast and from northwest to southwest. This process should end
by excavating the southern side from southeast to southwest. The work of
foundation must start from southwest to southeast, southwest to northwest;
southeast to northeast and end from northwest to northeast. Similar process is
required for wall constructions. Importantly, at the end of any day, the walls
at southern and western sides should be higher than the walls at north and
eastern sides. The temperature in the locality determines the height of walls;
prefer high ceiling if the temperature is high and low ceiling if temperature
is low.
Pillars :
Pillars should square or cylindrical in shape but pillars at southeast must be
invariably square in shape. Main entrance should not face the edge of any wall,
pillar, or compound wall. Likewise there should not be any tree, well, sump,
pit in front of the main door. The northeast corner of the outer walls,
compound wall should never be rounded off, where as it is permitted in othercomers. Do not have arches of semicircular shape on gates located on eastern
and northern sides, but such semicircular arches are permitted on gates located
in south and west.
Flooring :
The flooring of the house should laid so as to facilitate the flow of water
from southwest to northeast. The level of doors should gradually go on reducing
from south to north and west to east. The floor level of the rooms in southwestshould always be higher when compared to other rooms in the house and it shouldbe lowest at northeast. The flooring should be strong and firm avoiding any
shallow sound. If you are demolishing any old house, start it from northeast
and store reusable items in southern or western parts of the site, since the
work if starting from south or West brings ill health to senior male and female
member of the house. An experienced mason knows most of these basic principles
who plays an important role.
No comments:
Post a Comment