An article about " Developing Property through Joint Venture "


 Joint_Venture

Urbanization has accelerated migration of people to the nearby cities in search of jobs andother means of livelihood. This increased influx of population to the cities has in turn caused the paucity of residential accommoda­tion. The employees prefer to have accommodation near to their job centers to avoid wastage of time in commuting, resulting in vertical growth of city instead of lateral growth. Vertical growth saves lot of land and can accommodate a number of families in a small space. But, vertical development of land requires heavy investment which in turn has led to joint venture.
Joint venture is joining of hands. The words "Joint Venture" is described in the dictionary as "a business activity by two or more people or companies working together".
As stated above, vertical development of land comprising number of flats requires lot of money, manpower, expertise, experience, which an individual cannot undertake. Many a time an individual may own some land, but may not have funds to fully exploit it. Similarly a builder developer who has a resource may need some land to employ his resource profitably. Thus, the owner and developer join hands to develop the land.  
Unlike construction of an independent house, the group housing or construction of apart­ments is more complicated, requires approval from various agencies like water supply board, sanitary department, power supply board and Airport Authorities, The project requires to be approved by banks for finance. Joint venture agreements clearly stipulate the duties and responsibilities of each of the parties.
In order to avoid spending huge amounts for procurement of property, the developers venture into joint development activity with land owners through joint venture agreements, develop the property and hand over certain number of flats to the land owner. The number of flats/apartments given to the land owner depends on the prevailing market value of land in that area at the time of project commencement.
The developer or builder enters into an agreement with the owner of the land known as Development agreement or Joint Development Agreement or Joint Venture Agreement. An immovable property for development may be either vacant land or land with structures thereon.
A developer or builder enters into an agreement with the owner for purchase and development of the land. The development agreement contains obligations and rights of land owners and builder, like obtaining statutory permissions, ratio of sharing the developed property between owner and developer, process of finding prospective purchasers and funding the project, time duration of comple­tion and penalties for violation.
The agreement contains the particulars like the commitment of the promoter to construct it as per the approved plan and specifications as approved by the local authority; possession date, price to be paid by the purchaser and the intervals at which the installments are to be paid specifying stage of construction; precise nature of the body to be constituted of the persons who would take the flats; details regard­ing the common areas and facilities specifying the percentage of undi­vided interest in the common areas and facilities appertaining to the apartment  agreed to be  sold;   a statement of the use for which the apartment is intended. Copies of the title certificate issued and a copy of the approved plan and specifica­tions, a list of fixtures and amenities including provisions for lifts to be provided for the flat to be sold should be attached to the agreement.
A promoter, while he is in possession and when he collects from persons who have taken over flats or are to take over flats sums for payment of out goings, has to pay all out goings until he transfers the property. The outgoings would include ground rent, municipal and other local taxes, taxes on income, water charges, electricity charges, revenue assessment and interest on any mortgage or other encum­brances, if any.
One should also ensure that the area of the apartment has been mentioned in the agreement. It is also mandatory for the devel­oper/promoter to convey the land in favour of the society/association of flat owners /condominium /Com­pany within a stipulated time.
The development agreement must be in writing and registration of this agreement is not compulsory. If the developer meets the above requirements, he is well protected and can start construction work. But in case the developer commits any breach of the contract, the defence under Sec. 53 A cannot be availed.
Apart from equities, the developer would have a right against a subsequent transferee of the property with notice of the devel­oper's right or a gratuitous transferee of the property under Sec. 40 of the TP Act but not against the transferee for consideration and without notice of the rights of the developer against the property.


After examinationof the property of the land owner, the developer offers to him his offer fordevelopment of the property. This offer basically consists of the percentage of the built up area which shall be offered to owner towards cost of the land and the amount of security deposit that will be paid. This security deposit is a refundable advance which has to be refunded back to builder on successful completion of the project.
The percentage of area offered to the owner is arrived at after taking into account several factors such as cost of the land, cost of construction, escalation in cost of construction, cost of obtaining approvals for the building, marketing and administra­tive expenses and most importantly the selling price of apartments in that area.
If the offer is attractive, the land owner will give his acceptance and hand over a copy of the title docu­ments to enable the builder to get the same verified by his Advocate.
If the builder's Advocate approves the title, a draft copy of the Joint Development agreement laying down the terms and condi­tions of the development is given to the landowner for his approval who generally get it vetted by his Advocate.
If the draft of the Joint Development agreement is found to be okay, the same is prepared and prescribed stamp duty is paid. This agreement is signed by the Builder and landowner and the builder pays the first portion of the refundable advance to the landowner.
Along with the Joint Development Agreement, the landowner also gives a Power of Attorney to the Builder to apply for various approvals required for construction and also to sell the portion of the area coming to the Builder's share.
The Builder then gets the plan prepared by an Architect, taking into account the requirements of the landowner. Once the plan is ready and approved by the landowner, the same is submitted for approval of the Government authorities.
After the plans are submitted and approved, the builder takes possession of the land from the owner. At this stage, the balance portion of the refundable advance is paid to the landowner.
After taking possession of the land, the builder proceeds to demol­ish the old building if any and get the site ready for commencement of work.
On receipt of the approval, the builder commences the construction and marketing of the project.As and when the apartments falling to the builder's share are sold, the proceeds are received by the builder in stages and the builder will register the apartments in favour of the buyers.
Out of the apartments coming to the landowner's share, they may like to retain some apartments and sell the balance. The landowner can decide to sell his apartments initially or sell the same when the building is 50% over or when it is nearing completion or after completion. Based on the requirement, the builder will sell the landowners apartments and pass on the proceeds to the landowner as and when the same is received from the buyers. When the landowners' flats are sold and a payment is received, the landowner will register these apartments in favour of the buyers.
On completion of the project, the apartments being retained by the landowner are handed over to him and the advance which was given by the builder at the time of commence­mentof the project is refunded back.
The builder and the land owner will facilitate formation of a Flat Owner Association and hand over the title documents to the Association.

As per Sec. 54 of the Transfer of Property Act, an agreement for sale does not create any interest in the property in favour of the purchaser though the consideration is paid partly or fully unless and until a deed of transfer by way of sale or lease is
executed in favour of the purchaser. Many Joint Venture agreements are supported by Power of Attorney executed by the owner in favour of the developer for the development works and enters into anagreement to sell and a sale deed tothe extent of developer's share after completion of the total building.

Saturday, 18 October 2014

An article about " Solution in sight to our Garbage woes? "

 Solution
BBMP can heave a sigh of relief, albeit temporarily, as they have managed to convince the Mandur villagers to dump the garbage at the Mandur landfill till January 29, 2013.The Mandur citizens have given their consent to dump the garbage at the Mandur landfill on the assurance given by BBMP that a scientific method of garbage disposal would be undertaken at Mandur with immediate effect.
The BBMP Commissioner has said that the date of January 29, 2013 as the deadline to stop dumping garbage in Mandur has been worked out by taking into consideration the daily garbage segregation right from the household level. The Commissioner added that, once the segregation at household level is assured, there would be no need for landfills.This is only a part of the story.
Mounds of garbage are piled up all over the city.This stinking garbage with its exposure to the frequent rains is a sure recipe for the spread of deadly diseases like dengue, malaria etc. This is the most important factor that should draw the attention of not only the civic authorities but also the Bengaluru citizens.
BBMP is likely to submit a plan of action in High Court in the hearing on the PILs on November 6th. The outline of the plan that BBMP is likely to submit comprises-training for waste segregation, setting up decentralised waste processing units and setting up centralised processing units and landfills. The HC has urged the BBMP to penalise the citizens who do not segregate waste and also on garbage contractors who violate terms.
The training ofcitizens and the BBMP staff in segregation and processing is going to be a herculean task given that the primary task of waste segregation at the household level is yet to pick up. Many are either unaware of this task or they are indifferent to this idea.
The BBMP is well advised to launch a massive, door to door and sustained campaign on waste segregation and processing in order that the campaign yields a permanent and lasting solution. Let us fervently hope that BBMP would raise to the occasion and act on a war footing to end the crisis.

Thursday, 16 October 2014

An article about " Tips on Electric Power Consumption "

 Tips on Electric Power Consumption
Most equipment and devices at home consume energy. But rarely are we aware as to how much energy they consume and how it can be reduced. An understanding of the main household energy guzzlers and how they can be more energy-efficient is vital both in our interest as well as in the interest of the environment.
All our equipments from lamps to heaters are marked by the amount of energy they consume for a very hour of usage. The electrical energy consumed per hour by any appliance is specified in Watts (W). 1000 W is equal to 1 kilowatt (1 KW), which is nothing but one unit of consumption. The Electricity Board charges us based on the units consumed.
In a summer month a normal household consumes on an average about 526 units a month. In a winter month, the same household consumes about 282 units. A break-up of this shows that bulk of the consumption in summer is in the usage of air-conditioners. It works out to about 53 per cent followed by fans and refrigerators, which are about 11 percent each. Television and lights each consume about 8 percent of the total energy. A 4-hour usage of computer consumes another 4 percent. It is evident that usage of the air-conditioner is the main source of energy consumption.
On a winter day, when no air-conditioner is used, the fans consume the maximum energy and the refrigerator is the next biggest consumer of energy at 18 percent. Water heaters and TV each consume about 17 percent energy and the lights at our household consume around 15 percent energy.
Obviously, the lower your electrical consumption, the lesser is your electricity bill. You will note that as our consumption goes up, the cost per unit increases as well. A bimonthly consumption of 600-800 units is an optimum level for a typical Indian middle class household and energy saving measures adopted by each one of us will go a long way in reducing energy consumption.
Saving energy at home is fairly simple; it just requires us to adopt some of the guidelines indicated below:


Use leak proof doors and windows and seal all openings in an air-conditioned room to avoid leakage of cool air, thereby improving the efficiency of the air conditioner. Regular cleaning of A.C. filters (at least once a month) also improves the unit efficiency and reduces power consumption. In case the room to be conditioned has an exposed roof, then under deck insulation for the room is highly recommended to reduce the heat transmission from the roof slab. Set your air-conditioner thermostat to 25 Degree C of higher. For every degree you raise your thermostat setting above 22 Deg C, you can save up to 5-7% on your cooling costs.


Defrost the refrigerator once the ice gets more than quarter inch thick. Regular defrosting helps reduce the power consumption. Avoid placing the refrigerator near any heat source and locate the refrigerator at least 200mm away from the wall. Ensure that the refrigerator door is airtight to prevent leakage. Ideally, set your refrigerator temperature at 2.2 Deg.C. and your freezer temperature at-15 Deg. C. for energy-efficient operation.


Replace conventional fans with energy efficient fans. Use electronic regulators instead of electromagnetic regulators. Lubricate fan motor bearings periodically and clean fan blades regularly.

 
Replace T12 or T10 fluorescent tubes with T8 or T5 energy efficient fluorescent tubes which are more than 10 to 30 percent energy efficient. Use compact fluorescent lamps (CFL) which are 70 to 80 percent more energy efficient instead of incandescent light bulbs. Replacing electromagnetic ballasts in tube lights reduces the energy consumption by around 20 to 30 percent. Utilise energy efficient 36W slim tubes instead of 40W tubes. Use standard pins to tap supply from plug points. Reduce the wattage of bulbs in areas where less lighting is needed such as toilets store rooms etc.


Lowerthe thermostat on your water heater since most factory settings of water heaters are at higher temperatures. A setting of 12o F provides comfortable hot water for most applications. Insulate your electric hot-water storage tank, but be careful not to cover the thermostat. Keep the area around your water heater clean and well ventilated.


Use energy efficient motors for the grinders. Use the gadgets to their full capacity. Avoid rewinding of the grinder & mixer motors.


Configure your computer to “hibernate” automatically after 30 minutes or so of inactivity. The “hibernate mode” turns the computer off in such a way that you do not have to reload everything when you switch on your computer on again. The less energy we use, the longer the world's natural resources such as oil and coal, will last. Energy saving is essential because the world's energy reserves will be consumed at a slower rate.

Wednesday, 15 October 2014

An article about " Builder to pay Rs. 25 Lakh for fleecing Couple "

 BUILDERSTO PAY
The Maharashtra State Consumer Disputes Redressal Commission has ordered a Builder to pay Rs. 25 lakhs to a Doctor Couple form Mahim, after they were charged an extra Rs. 12lakh under the garb of penal interest.
The couple had booked two flats in the SRA building in 1997 but received their possession only in 2008. According to the panel, the interest or penal interest charged on account of defaults is absolutely unjustified and is an excess recovery made by the Builder without a reason. So, each complaint is entitled to claim amount back.
The Builder will have to return Rs. 6.92 lakh, along with 18% on it since 2007, to Mrs. Dr. Sangeeta and to Mr. Dr. Hemanth Pikale. The duo will also receive Rs1 lakh each for mental agony caused to them and Rs. 25,0000 each for costs of the complaint. The Builder will also have to give them the Occupation Certificates.
In 1997, the Pikales bought the flats, each 344 sq.ft. in a building in Mahim that was to be developed and constructed by innovative Constructions Pvt. Each cost Rs. 21.37 lakh. Even though possession was to be handed over in three years, the Pikales received them on January 8, 2008. They alleged that just before handing over the flats, through a letter in December 2007, the Builder demanded more money. In January 2009, the complainants issued a notice through their Lawyer and demanded compensation for 5 the delayed possession and to return with interest Rs. 6.02 lakh, illegally recovered as penal interest. As the Builder did not respond, the couple lodged two separate complaints in the commission in 2009.
The Builder denied the allegations. The commission referred to the submission made by Mrs. Dr. Sangeeta, that whenever the Builder raised a demand, she found the construction was not of the desired stage and so, the demand made was premature. According to the Commission, Inspite of the checking out what the demand was, she went on making the payment, but not strictly within 5 days of the demand received, as the Builder could not justify his demand. The Builder cannot blame the complainant for delayed payment and cannot invoke clauses in the agreement to charge any interest.

Tuesday, 14 October 2014

An article about " Fixtures, Fittings & Furnishings "

 Fixture
Inspiration and skill can be expressed through creativity which has no limits to it. However when it becomes palpable it may come across some obstacles. The main obstacle that subdues creativity or even hides it altogether is dearth or lack of funds. Limitations of the budget affect the physical expression of creativity. Whenever you have to design a home, creativity is in demand and through wise use of a budget it can take on a material form.
Interiors of homes are usually carried out with a tight budget factor, and many ideas are put aside simply because of lack of funds. It is a challenge to the designer to cram in as many of these ideas as possible while sticking to the limitations of the budget.
Whenever you begin designing an interior of low cost you need to pinpoint the old existing materials which include furniture and handcrafted objects which can be re-utilized by giving them a coat of polish or remodeling it to another use.
Plenty of material is there for a moderate modern décor. Depending on the design, furniture made from rubber wood will be half or less than that of solid teak wood. Its durability has a span of 5-8 years according to how it is maintained. With the changing fashions and designs in today's world it is sensible to use this rather than teak that lasts for lifetime.
Rubber wood is light with a machine finish which makes it easy to assemble and dismantle. If you have chosen upholstered seating it is best to use cloth upholstery as synthetic leather can be uncomfortable. As leather is a natural product it breathes, which synthetic décor does not and this causes you to perspire. Genuine leather of course is too costly for a low budget décor.
Cane furniture has an airy look that goes better in the patio or in an informal space. It is not so durable and may last for two to three years depending on its upkeep. It is not as comfortable as rubber wood or upholstered seats. Rubber wood can show up in some arresting and neat designs. If you combine upholstered seating with cane it can give an exquisite touch.
When metal is used effectively it can look charming. MS steel is reasonably priced and can be used for seats and cots. It must be matched with the remaining setting. Using it in just a seat or cot may look awkward but if it is extended to the side tables, picture frames, curtain rods and candle stand, it will not look like a budget limitation but rather like a chosen theme.
Modular options can be used for side tables and display cabinets as they are not costly and also easily assembled. They are not as durable as solid wood. For wardrobes use particle board and laminate as there are many exotic laminates these days that look almost like veneer and you cannot make out the difference. For the cots, a mix of metal and rubber wood would be good as both are inexpensive and look stylish. You can have bunker beds in the children's room if there is more than one person and they can be a combine of metal and modular.
You can make the beds fashionable by using right colors. Bunker beds are suitable for children below 10 and are not good for older children. For them you should go for a traditional bed.  Sofa-cum-beds can be used to save space and are also less costly than a traditional cot.
For soft furnishings, many low cost choices are available. Imitation rugs that are synthetic and easy to maintain with designs featuring a traditional woolen or silk carpet are available. Another favorite is jute and cotton durries .
If you are interested in art works you can go to art bazaars that have local artists' work that are beautiful yet not costly. Some are very unique. Prints of famous artists can be framed well and hung in the appropriate place to give a special effect.
You can have inexpensive yet stylish flooring with glazed tiles and hide the low cost factor by using the correct colors. Earthy colors are good but beige or ivory is best with granite or a darker tile skirting. A rustic blend for the patio will look good. Stone too is cheap as compared to marble and vitrified tiles. They come in earthy colors and give a thematic appearance.
When it comes to the lighting you can have exotic lighting for the whole house at reasonable rates. Brush steel and glass or wood and glass are good low cost choices but they should be picked from a place where they do not charge too much for the designs.
For some light fixtures a false ceiling is needed and a false ceiling for the whole room will be costly. You could go for the less costly yet stylish choice to provide this detailing only on the sections concerned. 
For painting there are many products to be had and plastic emulsion or the high class varieties are not required. Oil bound distemper is just as effective and much less expensive.

You can easily mask any kind of low cost décor with the use of bright colors along with greenery. These give a warm atmosphere to a room, for example a low cost diwan with bright cushions really looks classy. Indoor plants can also be kept in appealing but not very costly planters.

Thursday, 9 October 2014

An article about " Reality asset may reward better than realty stocks "

 RealityAsset

India,the second largest Country in the World needs housing for 120 Crore people. With the economic development, income levels are going up and along with that, aspirations are on their way up. Yet, over the past couple of years the Industry has been in a state of crisis with stagnating demand and negative sentiments,multiple factors are responsible for this Skyrocketing real estate prices (both commercial and residential) across the metro Cities are, coupled with stubbornly high interest rates and have acted as major dampeners. Being by and large unregulated, most of the Real Estate Players have questionable ethics and governance standards, leading to significant loss of credibility. High interest rates for over the past 18 months have led to a reduction in demand for both residential and commercial properties. On the other hand the high cost of funds has hit the over-leveraged Builders hard.
The present year 2013 does not look too promising for the Real Estate Sector. Supply overhand continues to plague commercial reality. High interest rates affect both commercial and residential segments. Also corporate governance continues to be an area of significant concern for many Real Estate Companies. Most of the large listed realty firms have huge leverage in their balance sheets on account of unrelated diversification, which they have not been able to exit inspite of their efforts over the past few quarters. Though the interest rates are expected to come down in the near future, the reduction may not be enough to spur major demand growth.
By and large, Investors would be better off by staying away from Real Estate stocks. Exception to this can be made only in the case of Companies with extremely high governance standards such as Godrej Properties and Oberoi Realty.
In fact, the Investors are keen on real estate exposure and can probably look, at directly buying real estate rather than investing in real estate stocks.

Wednesday, 8 October 2014

An article about " QUALITY ASSURANCE IS MANDATORY FOR APARTMENTS "

 quality
Quality assurance in construction activity relates to proper design, use of adequate quality materials and components supplied by various vendors, proper execution of work by the contractor during construction and finally proper care during the use of structure including timely and periodic maintenance and repair by the user of owner. Hence, for quality structure every one starting from the planner, architect, designer, contractor, supplier of materials and the owner become responsible. Only then the final structure will have satisfactory strength, serviceability and long durability ensuring advantageous lower life cycle cost. Most apartment buildings are made of R.C.C. framers. The properties of the completed structures should be consistent with the user requirement and assumptions mad e during the planning and design.  This could be achieved only by proper quality assurance measurers.
Quality assurance involves both technical and organizational aspects. The apartment project should have an explicit quality assurance Plan. This plan should identify key elements necessary to provide fitness of structure and the methods by which it is provided and quantitatively measured. This will give all the stake holders, the confidence that the realized project will work as per norms in service, thus fulfilling the user needs. This will involve quality checks (audit) of both inputs and outputs.  Inputs are in the form of materials machinery and manpower. Workmanship in all stages of batching mixing transportation, placing compaction and curing should be explicitly checked and recorded. The quality of the final product will be satisfactory only if approved plants and machinery and equipments for the process are used. All these should form part of the quality assurance plan. To ensure that the inputs comply with design an inspection procedure should be set up covering materials, records, workmanship and construction. Tests should be made on reinforcements andconstituent material of concrete in accordance with Bureau of Indian Standards. There should be clear instructions on inspection standards. The elements should be checked against the design detail with due allowance for dimensional tolerance. The output is in the form of concrete and elements of the structure in place. To ensure proper performance each step in construction should be inspected before the next step is taken. This should be followed as the work progress. Care should be taken to see that elements critical to workmanship, structural performance, durability and appearance are identified for special inspection. The system to verify the quality should include the individual parts of the structure especially the identified critical ones.  Immediately after striping the form work, all concrete shall be carefully inspected and any blemishes or defects rectified before proceeding with further work.


Supervision at each step is a part of the plan. It is not possible to alter concrete dimension once placed. Hence constant and strict supervision is a must during the progress of work. This should include all aspects of concreting such as proportioning, mixing, placing and curing. Supervision is of extreme importance to check the reinforcements and its relative disposition before being covered by concrete. Each and every contributor to the project should make and implement a quality assurance plan with respect to the project. Supplier, contractor and subcontractor’s participation should be covered by the overall plan. The individual agency’s quality assurance plan should fit as a part of overall plan. The plan should define the tasks and responsibilities of all agencies involved. It should state adequate checking procedures and the organizational set-up for documentation. The owner should have a periodic maintenance plan to ensure long and trouble-free service from the quality structure. Maintenance is also required to keep the structure in a fit condition to resist unexpected overloading due to disasters such as earthquakes and cyclones. Such maintenance scheme will also reduce the life cycle cost of the structure.

The documents should necessarily include the following:

  •    Approved site layout plan,
  •    Architectural plan,
  •    Soil report and bore log data.
  •    Structural design details with structural plan,
  •   Test report and manufacturers certificate for materials concrete mix design details.
  •    Pore cards for site organization and clearance for concrete placement.
  •    Records for site inspection of workmanship.
  •    Periodic filed test results,
  •    Non-conformance reports and correction action taken,
  •    Quality control charts.

11)Completion report with a suggested maintenance scheme.